Why frame house?
RAPID DEPLOYMENT
Standard 180m2 frame house, from start to finish takes about 12 weeks with a partially finish and about 16 weeks, with a full finish. Construction work may be carried out during the cold season.
WARM AND HERMETIC
In a frame house the thermal insulation is used in the design part, so it is possible to reach a large wall thermal resistance. The thermal resistance of the house and the house tightness is serving to reduce heating costs.
ECOLOGICAL
Frame houses made of recurrent primary raw materials. Based on ecologically pure “breathable” material. Construction technology keeps order at the construction site and do not harm the environment.
ECONOMICAL
It is unnecessary to use large construction equipment for a frame house, this reduces construction costs.